Tuesday, 25 October 2016

SANGAM 16

SANGAM16

SANGAM is the Largest Independent Oracle Users Group Conference in India, organised annually in the month of November.

This year's Sangam (Sangam16 - 8th Annual Oracle Users Group Conference) is in Crowne Plaza Bengaluru Electronics City on Friday 11th & Saturday 12th November 2016. Checkout the schedule from the link

Sangam 16 Schedule https://sangam16.sched.org/

Hello Everyone, As you all know Sangam 16 event is about to come on 11 and 12 November 2016, Please check the schedule from the link

The List of Speakers is here

Saturday, 8 October 2016

Protecting Schemas in Oracle 12C Vault

Recently i made a video tutorial for Protecting Schemas in Oracle 12C Vault, here is the Link

Recovering datafiles in Oracle 12C Multitenant Database

Recently i made a video tutorial for Recovering tablespaces in Oracle 12C Multitenant Database, here is the Link

Creating a database with Vault Option in Oracle 12C

Recently i made a video tutorial for Creating a database with Vault Option in 12C, here is the Link

Adding a database as a target to 12C Cloud Control

Recently i made a video tutorial for Adding a database as a target to 12C Cloud Control, here is the  Link

Friday, 9 September 2016

Exadata X6-2 enhancements in the hardware

While there are so many great features in Exadata Database Machine software, in this post we will see what is inside Exadata X6-2 when it comes to the hardware

Exadata X6-2 enhancements in the hardware

Database Server

# For each databaser server, Exadata X6 -2 Machine now comes with 2x 22-core Xeon E5-2699 v4 processors per Database Server
# Memory defaults to 256 GM RAM and 768 GB (max)
# disks 4x 600 GB 10,000 RPM disks (Hot-Swappable) Expandable to 8


For each Storage Server HC

CPU :- 2x 10-core Xeon E5-2630 v4 processors and the same goes for Extreme Flash Storage
Memory :- 128 GB
Disks :- 12 x 8 TB 7,200 RPM disks
Flash :- 4 x 3.2 TB NVMe PCIe 3.0 flash cards


For each Extreme Flash Storage Server

CPU :- 2x 10-core Xeon E5-2630 v4 processors
Memory :- 128 GB
Flash Capacity :- 8x 3.2 TB NVMe PCIe 3.0 flash drives


That means if you have a full rack Exadata Database Machine and if you go with Extreme flash storage you get 358.4 TB flash capacity, 8 x DB servers 352 cores , 14 x Storage servers 280 cores for SQL offload. Really Extreme performance.